About the project

  • Date: 2019
  • Client: Private Home Client
  • Category:
  • Address: Private

Project Requirements

Client wished to have a solution that was scalable for his dream towards saving on his utility bill and having power where grid is not available.

Solution

Client first install a 5 Kw Grid Tie system towards energy costs. Client then had 15Kva Inverter installed with 1 x 7.1 Supercapacitor. 3 x 7.1kwh Super caps were added to installation at a later stage to take the client 80% Off the grid.

Result

15 Kva Off-grid Inverter
5Kw Solar Grid Tie Inverter with 6 Kwp Panels
2 x Mppt Chargers with 6 Kwp Of Solar Panels
4 x 7.1 Kwh Super caps = 28 Kwh of Storage