About the project

  • Date: 2019
  • Client: Marloth Park Guest House
  • Category:
  • Address: Marloth Park

Project Requirements

This beautiful newly built Guesthouse required a solar power system as the client did not want to have a grid connection. The Client is a Electrician with over 40 years experience and built a very efficient home with Led Lights, Solar water heater with gas backup. Client required a solution that can be scalable due to unknown power consumption of the new clients to his guesthouse.

Solution

The Solar System was initially installed with 3 Kw P of solar panel and a 5Kw Inverter and 1 x 7.1 Kwh Sirius Supercapacitor module.6 Month later an Additional 7.1 Kwh Unit was added to make provision for additional load through the night for inverter type air conditioners.

Result

The client achieves full night time autonomy through installing an additional 7.1 Kwh in Storage. Sirius Supercapacitor Modules do not degrade as It has Graphene enriched Cells with no Lead, Acid or electrolytes so modules can be added to existing modules if power requirements change for solar systems.